Two Tuas industrial properties offered for sale: build-stage or rent-producing?
The same owner is seeking S$20 million for a larger building awaiting completion and S$25 million for a smaller completed property. Here is how the reported offers compare.
Published 2026-11-06 · 5 min read
An industrial property still under construction in Tuas is being offered at a S$20 million guide price, while the same owner is seeking S$25 million for a nearby completed building reported to be generating rental income. The two offers, reported on 30 October 2026, put a concrete choice in front of buyers: a lower entry guide and more built-up space, or a smaller building already completed.
Both include reported approval for workers’ accommodation alongside industrial production facilities. But their timelines differ: the five-storey development is expected to obtain its temporary occupation permit, or TOP, by end-2027; the completed four-storey property obtained TOP in 2026. For an occupier matching an acquisition to business needs, that timing difference belongs alongside the price comparison.
What is being offered?
SRI agents Alan Lin and Alvan Ng are jointly marketing the under-construction property. The owner is also offering the completed property nearby, along the same road loop. Buyers can acquire them separately or together, with a combined guide of S$45 million through an expression-of-interest exercise—a process inviting prospective buyers to submit offers. These are asking guides, not completed-sale prices.
The lower-priced development combines production facilities, a ground-floor minimart and reported approval for a 200-person secondary workers’ dormitory. Its reported built-up area is 36,983 sq ft on approximately 14,800 sq ft of land.
The completed property has 32,406 sq ft of built-up area on a larger, 17,097 sq ft site. Its reported current dormitory approval accommodates 196 workers. The comparison therefore involves two different building configurations, rather than a choice between otherwise identical properties at different prices.
| Reported offer | Under construction | Completed |
|---|---|---|
| Guide price | S$20 million | S$25 million |
| Storeys | Five | Four |
| Land area | Approximately 14,800 sq ft | 17,097 sq ft |
| Built-up area | 36,983 sq ft | 32,406 sq ft |
| TOP timetable | Expected by end-2027 | Obtained in 2026 |
| Reported approved dormitory capacity | 200 workers | 196 workers |
| Rental status | Completion still ahead | Reported to be generating rent |
All property particulars in this comparison are reported offer details, rather than independently inspected building or approval records.
The cheaper guide comes with more built-up space
Dividing each guide price by its reported built-up area gives approximately S$541 per sq ft for the under-construction property and S$772 per sq ft for the completed one. The calculation uses the whole reported building area, not just dormitory space or production space.
On that basis, the completed building’s guide is about 43% higher per built-up sq ft. In dollar terms, it is S$5 million more expensive despite having 4,577 sq ft less built-up area. Conversely, its land area is approximately 2,297 sq ft larger. These calculations show why the total guide alone gives an incomplete picture of the two offers.
For an industrial occupier, the useful distinction is between land and building space: the S$20 million offer has the smaller plot but the larger reported building. The available figures do not break down how much of each building is devoted to production, accommodation or other facilities, so the total area comparison cannot establish which offers more space for a particular operation.
Nor can the S$5 million difference be allocated to completion status, rental income or land area individually. Those characteristics come together in the completed property’s asking proposition; the arithmetic is a comparison of the offers, not a valuation of each feature.
Keep 196 approved places separate from the expansion application
The completed property has an application underway to increase its dormitory capacity from 196 to approximately 250 workers, subject to regulatory approval. The larger number is therefore potential capacity, not its reported current approval.
Across the pair, the reported approved capacity is 396 workers: 200 at the development under construction and 196 at the completed property. That combined figure describes approved capacity across two assets at different stages, not a claim that all those places are occupied or available immediately.
The proposed expansion would add approximately 54 places at the completed building if approved. For anyone comparing accommodation capacity today, however, 200 versus 196 is the relevant starting point. The application is a separate future development to track.
Same lease starting point, different income timelines
Both properties are reported to occupy URA-administered industrial land on 60-year leases commencing in 1996, leaving approximately 30 years at the time of the report. The newer buildings therefore share broadly the same remaining land-tenure position; completion does not mean a fresh 60-year lease.
The completed property is reported to be generating rental income, but the report does not provide the actual rent collected or operating expenses. Its income-producing status is a meaningful difference from a development awaiting completion, while the amount available to an owner after expenses remains unresolved.
Taken together, the offers present a focused acquisition choice: more reported built-up area at a lower guide, with completion ahead, or a higher-priced, completed property with reported rental income. The next meaningful developments are whether buyers meet those guides, whether the end-2027 completion expectation is achieved, and whether the completed building’s capacity application receives approval.